Electrical Inspection & Testing Buildings

testing
We have been carrying out the inspection and testing of buildings for over 22 years and bring skilled professionals knowledge at competitive prices.

The Law

Electricity at Work Regulations 1989 (EAWR) places a legal responsibility on employers and employees, as duty holders to ensure that electrical installations & equipment used during work periods are safe.

Legal Requirements

To achieve compliance with the law the legal requirements of the Electricity at Work Regulations 1989 requires proof that an electrical installation or equipment is safe. Inspection and testing of an installation by competent people and the creation and maintenance of records would help achieve these requirements.

Electricity at Work Regulations 1989 is part of the Health & Safety Act and is the Law in Britain.

Electrical Condition Report

It is recommended that an inspection of all electrical installations is carried out at certain times to be sure that the installation has not deteriorated to such an extent that it may pose a risk of fire, to persons or livestock. Our SOFTWARE is approved by the NICEIC

The report identifies and classifies problems according to BS7671 standards (IEE Wiring Regulations):

  1. Danger present
  2. Potentially dangerous
  3. Improvement recommended

Experienced

The experience gained over 24 years has enabled us to become experts in the inspection and testing of low voltage installations.

If you would like to find out more about how we can help you with your requirement, please contact us without obligation. We have been carrying out the inspection and testing of buildings for over 24 years and bring skilled professional knowledge at a competitive price.

In addition to the inspection programme we supply Auto Cad Schematic drawings of the sub-mains that are installed at the point of origin. Distribution board charts are installed at every distribution board identifying the circuits.

  • ICP Network Connections (NERS) live Jointing Mains

    From planning to reinstatement we do not let you down.

  • From Site to Client

    We carry out the works and can issue the certificates from site direct to your email before we leave.

  • Twitter

    @cabletestltd

  • Fault Location Tower of London 

    We get about, carried out fault location at Tower of London on a 240mm main within the moat......didn't find any bones.....

  • ICP / UCP Transfers and New Mains Connections 

    We have carefully been carrying this out for all of 2013. NO COMPLAINTS always reliable

  • Data Capture success to success

    With all of our works carried out with Handheld GPS/GIS data capture we are leaps ahead. Real live data capture with networked handhelds with mobile capability.