Inspection & Testing Street Furniture

With over 18 years experience in the electrical industry & 14 years directly involved with electrical & structural inspections of street furniture you can rely on our expertise.

Inspection-testing

We offer services of electrical inspection and testing with rates that are very competitive. We have an in house software system for the collection of inventory and defects and can issue these reports in many different electronic formats. We as a company do not restrict our inspection and testing programmes to our own software and if our clients have a system in place for this facility then we are happy to consider different options.

We can carry out the Structural testing of the root section when we carry out the Electrical Inspection of a Street light. The patented technology works using phase angle technique that can test the full root as per ILE TR22. This instrument has been testing the structural integrity of steel work for over 10 years and is a tried and tested instrument.

The Law

Electricity at Work Regulations 1989 (EAWR) places a legal responsibility on employers and employees, as duty holders to ensure that electrical systems used at work (under their control) are safe.

Legal Requirements

To achieve compliance with the legal requirements of the Electricity at Work Regulations 1989 requires proof that an electrical system is safe, which involves amongst other things, proper inspection and testing of a system by competent people and the creation and maintenance of records.

Electricity at Work Regulations 1989 is law in the UK.

Experienced

The experience gained over 20 years has enabled us to become experts in the inspection and testing of low voltage street lighting furniture. We can combine quality with cost effective rates.

Street lighting services

The electrical inspection and testing service provides our clients with detailed reports of their lighting stock and defects associated with each unit. This can be issued in various formats.

  • ICP Network Connections (NERS) live Jointing Mains

    From planning to reinstatement we do not let you down.

  • From Site to Client

    We carry out the works and can issue the certificates from site direct to your email before we leave.

  • Twitter

    @cabletestltd

  • Fault Location Tower of London 

    We get about, carried out fault location at Tower of London on a 240mm main within the moat......didn't find any bones.....

  • ICP / UCP Transfers and New Mains Connections 

    We have carefully been carrying this out for all of 2013. NO COMPLAINTS always reliable

  • Data Capture success to success

    With all of our works carried out with Handheld GPS/GIS data capture we are leaps ahead. Real live data capture with networked handhelds with mobile capability.